Overview
The Stanford Hospital is a signature project that was built to accommodate the most advanced medical technologies, expand the capabilities of its renowned health care professionals and enhance the patient care experience.
This 824,000 square-foot facility includes a flexible pavilion design, which features 368 patient rooms in the new building; a new Level 1 Trauma Center (Emergency Department); and state-of-the-art surgical, diagnostic and treatment rooms. The Stanford Hospital will also exceed seismic standards. It is base-isolated and designed to remain functional after an 8.0 magnitude earthquake.
The entire building team has adopted a collaborative mindset utilizing innovative, effective and schedule-driven construction solutions to achieve Stanford Health Care’s vision for this project. The design and construction project teams are co-located on the job site, facilitating optimal scheduling, cost and quality outcomes while minimizing impact on the current Stanford Hospital, which remains open and fully operational.
This project is set to complete in late 2017 and open for “Operation” by early 2018. The hospital is aiming to achieve LEED Silver certification.
SERVICES
- Interior metal stud and framing
- Drywall
- Taping
- Plaster
- Lead drywall
- Insulation package
- Fireproofing